Xining intends to use 1 billion 530 million yuan efforts to control water

Xining intends to apply for the use of the bank’s advanced concepts and loans 1 billion 530 million yuan, to carry out large-scale environmental management. In March 19th, Xining comprehensive management environment on the World Bank senior experts, water conservancy project manager Zhang Ximing as the head of the world bank loan project identification teams to come to our city, will be for a 8 day tour in the city, which marks the world bank loan project has entered a formal review process. March 19th morning, the project will start the work of identification, vice mayor Xu Guocheng attended the meeting and made a welcome speech.

implementation of a series of environmental engineering in recent years

in recent years, the city implemented a series of environmental engineering, the North-South Mountain Green River environmental remediation, the environmental problems of air pollution, noise pollution and so on in the national standard range, but the problem of water pollution is still serious, the main problems exist in four aspects: there are suburban sewage outfall straight row River phenomenon the phenomenon of seasonal river; water shortage, the overall decline in river assimilative capacity, the use of recycled water shortage; some riverside districts are rubbish, inadequate facilities, city living environment dirty phenomenon to the river channel flood; surrounding gravity erosion is serious, the rainy season has rain water directly into the river silt phenomenon.

intends to implement the four flood control project

in July last year, approved by the State Council, the national development and Reform Commission, Ministry of finance will be included in the comprehensive management of the environment in Qinghai, Xining, the world bank loan 2013-2015 fiscal year program. Qinghai Xining environmental comprehensive treatment project with a total investment of 1 billion 530 million yuan, of which the world bank loan of $150 million (equivalent to about RMB 930 million yuan), self financing of $600 million.

The

project intends to implement four major flood control projects: city sewage collection pipe network project, the planning of new sewage collection pipeline 114.7 kilometers; reclaimed water reuse project, the planning and construction of 3 renewable water, the total size of 75 thousand tons / day; comprehensive control project environmental remediation of the river, the Beichuan river environment, the main content of the construction of road network and greening; comprehensive control project of flood ditch, comprehensive management of Xining Shen Jia Gou, Chaoyang electric ditch peripheral channel. (author: small words)
 

Leave a Reply

Your email address will not be published. Required fields are marked *